Updated on June 19, 2025 02:53:21 PM
In order to acquire a water boring license for commercial use in Puducherry, the applicant needs to follow through the laid down procedures by both the Central Ground Water Authority (CGWA) and Puducherry Water Resources Department. This process makes sure that water resources namely groundwater are exploited in a way that is instrumental and at the same time protects the environment. First, the applicants should have to make a preliminary evaluation of the groundwater status at the intended boring site such as the hydrogeological data, water table data, etc. The next step entails the submission of an elaborate application to the CGWA which entails information to do with the intended use, technical particularities of the boring exercise and the ecological implications of the operation. However, in order to carry on with the boring, it was required to acquire No Objection Certificate (NOC) from the Puducherry Pollution Control Committee that ensures that the boring proposed will not harm the environment. Applicants are also required to show measures on water conservations and formulation of the water recharge strategy. Despite the fact that it is less complicated compared to other business structures, the application process is exhaustive, and the applicant has to engage with various governmental organizations to acquire all the permits and authorizations. Moreover, the applicants must adhere to any certain regional standard and, after getting approval, install an IoT-based groundwater monitoring system.
A water boring license is a permit from the government that allows a person to bore a well to reach sub-surface water. It controls and oversees the pumping of water from the wells and aims at sensitizing people not to pump water anyhow. The applicant will be required to give details on the following; The intended use of the borewell, inner depth of the borewell, the intended location of the borewell, volume of water expected from the borewell among others. Technical appraisals and the environmental site assessment are also needed. There can be conditions that add strings to compliance with environmental legislation and water say policies; depth of drilling, type of equipment, amount of extract. The license is important in water resource management and ensuring proper demand and supply, water quality, and groundwater conservation. It is very important to adhere to the stipulated licensing provisions on ways of using water and managing the environment.
A water boring license offers several benefits that promote sustainable water resource management and ensure the responsible use of groundwater. Here are some key benefits:
It allows for the control of water abstraction with the result that the exploitation of groundwater does not go unrestrained and this water resource is well utilized. This is very important in the stabilization of the water table and prevention of exhaustion thereof.
The license promotes protection of the environment due to the guidelines and conditions associated with it. Thus, borewells are run in a way that they do not have adverse effects on the environment of the region and that such problems like soil erosion and sinking of the land are avoided.
Licensing usually comes with periodic checks and sampling for water quality to ascertain the quality of the extracted water. This assists in the enhancement of quality drinking water, water for agriculture as well as water for industries.
Appointing a water boring license expects people and companies to be on the right side of the law in regards to the provisions of the Law such as the Water (Prevention and Control of Pollution) Act, 1974. This eradicates legal complications and gives a positive encouragement for the appropriate usage of water.
The process of licensing is always accompanied by extensive paperwork and compliance and therefore contributes to efficient management of water resources. Through the water meters information can be gathered and analyzed in how water is used and the rate at which it is consumed and therefore help the authorities in planning for the usage in future.
To obtain a Water Boring License from the Central Ground Water Authority (CGWA), you must follow a structured procedure that includes submitting an online application along with necessary documentation. Here’s a detailed overview of the process:
Go to the official website of the CGWA and enter the site as a new user and generate a Log – ID.
Gather all the required documents that are required for the Application Submission.
Complete the e- Application form with regard to NOC for groundwater boring. Make sure that all the fields that one is supposed to fill are filled correctly.
Submitting the application complete, upon submission of the document, the CGWA shall scrutinize the application and the documents accompanying it. This may include an inspection of the site if this was considered necessary by the researcher.
In the case of a valid application, the NOC will be issued depending on the application filed by the candidate.
Once the applicant receives the NOC, he/she has to install the IoT based groundwater monitor system within 90 days from the date of issue and abide by the groundwater management practices.
To renew the NOC, submit the application for renewal at least 90 days before the expiration of the current NOC.
There is a list of documents the applicant will have to provide to the competent authorities to obtain the water boring license. While the specific requirements can vary depending on the region and the purpose of the borewell, the following documents are generally required:
CGWA-Water Boring NOC Application ProcessProfessional Fees for Water Boring NOC is ₹25000/- only with Professional Utilities
After the application is applied the No Objection Certificate is issued and will remain viable for a period of 2 years from the date of issue. Regarding the renewal of this No Objection Certificate the application has to be made 90 days before the expiry of the existing one.
According to the new guidelines of the Central Ground Water Authority, obtaining NOC is compulsory if the industry or any operation is using more than 10 cubic meters of well water. Besides this, the applicant has to also create an IoT-based Groundwater Monitoring System, in case of no completion of this criterion, the industry will have to pay a fine of ₹2 Lakhs
Conclusion
Applying for a water boring license in Puducherry can be regarded as the crucial stage for companies interested in accessing the groundwater in an appropriate manner. The licensing system followed is detailed and involves securing of a no objection certificate from the CGWA and the Puducherry water resources department as well as deploying an IoT based ground water monitoring system. This creates legal awareness, environmental conservation, and wise use of limited water resources. As a result, the implementation of these regulations is not only to avoid such legal problems and insane penalties but also for the optimal use of water. This is vital in any given Puducherry commercial undertaking in order to counter check the commercial demands with the availability of the groundwater ecosystem.
At Professional Utilities, we leverage our industry knowledge and expertise to help businesses navigate complex regulations, minimize risks, and optimize operations for maximum efficiency and profitability.
Water boring license is necessary in Puducherry to engage in the business of pumping water from the ground legally. This means that the water resources are utilized properly and without going over the limits and polluting the environment. The license also assists firms in avoiding legal problems and the consequent penalties for the unregulated extraction of water that may be caused by the laws prescribed by the Central Ground Water Authority (CGWA) and Puducherry Water Resources Department.
There are various processing fees that are charged by the Puducherry organization called Professional Utilities, and the professional fees for A water boiling license is ₹25000. There could be other government charges relating to the details of your application like the size of the borewell and the geographical area of the proposed borewell.
The water boring license also known as the No Objection Certificate (NOC) granted in the union territory of Puducherry is issued for a period of two years from the date of grant. To renew the NOC, one has to fill the renewal application form before the expiry of the current certificate by 90 days. This renewal process also helps that facility remain updated with the latest requirements on extraction and monitoring of groundwater.
There are heavy fines that one is liable to pay when they fail to adhere to water boring laws in Puducherry. Whoever develops any industry or operation which draws well water more than 10 cubic meters without NOC, may be penalized with ₹ 2 lakhs. Further, failure to put in an IoT-based groundwater monitoring system means failure to do so within 90 days of receipt of approval which attracts further fines and legal issues.
Speak Directly to our Expert Today
Reliable
Affordable
Assured